Consultancy
From permit to occupancy: the steps you need to know
Planning the process from design approval to the occupancy permit from the outset saves significant time and cost.

Bringing a building to life is not only about design and construction. The official process, from the zoning status of the plot to the occupancy permit, can become the longest phase of a project if it is not well planned.
1. Zoning status and preliminary review
First, the zoning status certificate of the plot should be obtained, and building conditions such as floor area ratio, setbacks and building height clarified. This document draws the limits of the design.
2. Preparing and approving the drawings
Architectural, structural, mechanical and electrical drawings are prepared in coordination and submitted to the municipality. Good coordination between disciplines minimises revision requests during approval.
3. Building permit and construction
Construction begins once the permit is issued. At this stage, regular inspections by the building control firm and progress payment processes come into play.
4. Occupancy permit
When the building is complete, the occupancy permit is applied for with the required documents and inspections. Keeping records complete throughout the process speeds up this final step.
“Regulations are not an obstacle the design must adapt to later, but an input to be considered together from the start.”



